

(500,00 £ per Vessel)
With the software in place, the user can then evaluate the SMM - Voyage Performance against Charter Party terms and provisions. Overall voyage assessment = Function {Fuel Consumption Calculation, Time Calculation, Charter Party Claims}. The SMM - Voyage Performance assists by establishing systematic records for the evaluation of the SMM - Voyage performance against Charter Party: fuel consumption calculation, time calculation, Charter Party claim and overall voyage assessment. For the SMM - Voyage Performance module, the solver is based on the monitoring and reporting of basic parameters during the voyage, their comparison against reference values under actual conditions, charter party terms and warranty conditions. Office fleet-based version.
Back to homepage: Click here
Immediate benefits of this software to your good Company are the following:
1. With the software in place/ the user can then evaluate the voyage performance against Charter Party terms and provisions.
2. For the Voyage Performance module/ the solver is based on the monitoring and reporting of basic parameters during the voyage/ their comparison against reference values under actual conditions and charter party terms and warranty conditions.
3. Overall Voyage Assessment = Function { Fuel Consumption Calculation/ Time Calculation/ Charter Party Claims }
The Voyage Performance assists by establishing systematic records for the evaluation of the voyage performance against Charter Party: fuel consumption calculation/ time calculation/ Charter Party claim and overall voyage assessment. Considering that in Charter Party CP agreements; speed and consumption warranties are incomplete or vaguely defined in engineering terms. Thus it has always been a challenge to determine whether ship performance is due to adverse external factors or due to a badly maintained engine system/ giving rise to disputes between charterers and operators.
Delivery terms
Preparation time is ten (10) working days after order and our receipt of all necessary technical data of the required Drawings Check-list.
NOTE: Due to heavy workload, above average preparation time expects to be exceeded. However, if this possible delay interferes with the normal operation of your vessel, please timely advise our company, so that we can take appropriate actions