Multiload Loading Program for Tankers Pro

£9,000.00
Tax excluded

Our Catalogue Prices are subject to Discounts determined by:

1. The volume of Order
2. Ship-Specific Software Configuration

MULTILOAD© for Windows is SMM UK Ltd.'s highly innovative loading software/instrument system to carry out the complex and tiresome ship loading calculations. It is one of the most efficient/ yet friendly packages of the international shipping market. Improved efficiency of operations, judgement and communication. Ease of use, versatility and additional useful options. The Base Program offers 43 functions (more than any other loading program). Approved by all IACS Members. Type approval by LR & DNV-GL. Direct damage stability type 3 as per MARPOL/IGC Code. There are up to 50 Multiload options to choose from. Full support and free in-house/distant training. Consultancy support on difficult loading conditions. Operational in windows network environment. Office fleet-based version. Installed on more than 1,000 Bulkers. Real time tanker loading with sensors. Oil cargo transfer with report. Air draft calculation from manifolds. Departure - Arrival calculation. Type approval by LR & DNV-GL. Direct damage stability type 3 as per MARPOL/IGC Code. Real time tanker loading. Worst case damage stability scenario as per VIQ7 Requirements.

Back to homepage: Click here 

LEAD OR SISTER VESSELS
Quantity

Immediate benefits of this software to your good Company are the following:


1. Improved efficiency of operations/ judgement and communication.

2.Benefit of harmonization with a TOP QUALITY in EASE OF USE/ versatility and additional options MULTILOAD.

Additional MULTILOAD Options are as follows:

- Air Draft Calculation from manifolds
- Departure & Arrival Calculation
- Real Time Tanker Loading
- Vessel List Calculation
- Autoload
- Cargo Assignment Into Groups
- Ship Loading plan on screen (ship graphics)
- Ship's Girder Deflection and Deadweight Gain or Loss

3.Direct Damage Stability Module according to MARPOL 73/78 Annex 1 Reg. 28 and IBC Code Chapter 2 includes intermediate stages calculations as required by IACS members

4. Fleet Based Program for Office Use.

5.Consultancy support on difficult loading conditions.

6.Operational to windows network environment.

Delivery terms:
Preparation time is twenty-five (25) working days after order and our receipt of all necessary technical data of the required Drawings Check-list.

NOTE: Due to heavy workload, above average preparation time expects to be exceeded. However, if this possible delay interferes with the normal operation of your vessel, please timely advise our company, so that we can take appropriate actions

ML for Tankers with OPTIONS

Data sheet

Department (Ashore)
Operations Department

Download

Drawings

Required Drawings Check-List

Download (28.56k)

Description of Product

Description of MULTILOAD FOR TANKERS

Download (259.64k)

You might also like

Reviews (1)

Rated 5.00 on the scale 1 - 5 based on 1 customer reviews

A palette of useful Modules

I was surprised when I discovered the plethora of available Modules and how such address to Oil majors needs.

Was this comment useful to you? Yes No