• Reduced price

Vessel Air Draft & Floating Position

€600.00
€300.00 Save 50%

(€300.00 per Vessel)

Tax excluded

It presents on screen the air drafts from the mid-point of Cargo Hatches. Additionally there is a custom point where you can input any of its coordinates and obtain the Air Draft for the current loading condition

Quantity

The most practical and cost effective way to retrofit your existing Loading Program without requirement of Class Approval. Please consider that this powerful MULTILOAD Option is provided as Stand Alone Option on top of your existing/ already/ approved Loading Program and in that way a sophisticated and care-free tool for instantaneous calculation of Air Draft from all cargo Hatches as well as propellers immersion for any vessels floating position is at your Hands.

Delivery terms

Preparation time is ten (10) working days per lead vessel after order and our receipt of all necessary technical data of the required Drawings Check-list.

NOTE: Due to heavy workload, above average preparation time expects to be exceeded. However, if this possible delay interferes with the normal operation of your vessel, please timely advise our company, so that we can take appropriate actions

Download

Drawings

Required Drawings Check-List

Download (30.88k)

You might also like