Cargo Split and Auto Trim Software

£600.00

(£600.00 per Vessel)

Tax excluded

Our Catalogue Prices are subject to Discounts determined by:

1. The volume of Order

2. Ship-Specific Software Configuration

Given a quantity of cargo that is yet to be loaded/ with this stand alone program can calculate how you should split the given quantity between two compartments in order to attain a given Trim. Sophisticated and care-free tool for instantaneous calculation of optimum cargo distribution for achieving the most efficient trim. Given a quantity of cargo that is yet to be loaded, with this module can calculate how you should split the given quantity between two compartments in order to attain a given Trim. Upgrade of the already approved loading program, without the need for Class Approval. Clarity & transparency based on official shipyard’s documentation endorsed by SMM (UK) Ltd. as 3rd party. Automatic synchronization of data between vessels and office (fleet-based). Office fleet-based version.

Back to homepage: Click here 

This module is particularly useful during the last stages of actual Cargo Loading operation in the port. Given a quantity of cargo that is yet to be loaded/ with this stand alone program can calculate how you should split the given quantity between two compartments in order to attain a given Trim. For example/ say we have 1000 MT of cargo to be loaded/ while the Drafts from a Draft Survey are known/ how much cargo should be loaded to the first compartment and how much to the second. You must ensure that the compartment chosen have enough space to accommodate the cargo. In case that with the two selected compartments the required Trim cannot be achieved/ the appropriate messages are displayed.

Delivery terms

Preparation time is ten (10) working days per lead vessel after order and our receipt of all necessary technical data of the required Drawings Check-list.

NOTE: Due to heavy workload, above average preparation time expects to be exceeded. However, if this possible delay interferes with the normal operation of your vessel, please timely advise our company, so that we can take appropriate actions

ML CSATS

Data sheet

Department (Ashore)
Operations Department

Download

Drawings

Required Drawings Check-List

Download (30.88k)

Description of Product

Download (203.19k)

Required Drawings Check-list

Download (68.42k)

You might also like

Reviews (0)